Technical information Arma-Chek Mastic Grey
PropertyValue / AssessmentStandard / Test method
Temperature range
Service temperature
Min. °CMin. °FMax. °CMax. °F
-40-40120248
EN 147061
Corrosion mitigation
Leachable (water-soluble) chlorides≤ 30 ppm (mg/kg or µg/g)EN 13468, ASTM C8712
Mechanical properties
Tensile strength≥ 2.9 MPaISO 373
Elongation≥ 200%ISO 373
Hardness (Shore A)≥ 50ISO 7619-1, ISO 48-4
Weather and UV resistance
UV resistance4ExcellentEN ISO 4892-2
Weather resistanceExcellent
Other technical features
Additional remarksMaterial type: Sealant based on silane modified polymers
Application conditions5,6,7Application temperature: +5°C to +35°C (+41°F to +95°F)
Max. relative humidity: 80%
Disposal and recyclingPlease refer to Safety Data Sheet
Shelf life18 months
StorageShould be stored in cool and dry rooms. Recommended storage temperature 5 to 30ºC. The container should be kept dry and sealed. Packaging must be emptied of all residues. Packaging with traces of cured product can be recycled. Packaging with uncured product must be disposed of in the same manner as the medium.
Working time8Open time: < 15 min.
Skin forming time: < 13 min. Curing rate after 24 hrs: appr. 3 mm
The above data is valid at 23°C and 50% relative humidity.

1Tested in a system comprising of ArmaFlex and ArmaClad Arma-Chek R covering.

2Specimen prepared according to EN 13486: neither cut, ground nor blended. Test temperature +100°C, leaching time 0.5 hours as specified in the standard for product maximum service temperature.

3Dumb-bell type II test piece.

4Xenon-arc with 5000 hr exposure and +60 ºC black panel temperature. 1000h: no cracking, no visible discoloration. 3000/5000h: cracking under microscope, slight discoloration.

5Application temperature refers to the ambient temperature during installation and the surface temperature of the substrate (e.g. ArmaClad Arma-Chek R covering) to which the product is installed.

6In some cases it may be necessary to avoid exposure of the substrate to strong sunlight.

7Please consult our Technical Services for further recommendations and guidance on the use of ArmaClad Arma-Chek Mastic.

8The application temperature shall not exceed +35°C for a period of 6 to 8 hours following application and shall not fall below +5°C for the entire duration of the cure. The cure duration depends on ambient air humidity and temperature and on the thickness of the bead.